Super Flat Floor Construction

Bach My provides top-quality highest performance floor basically prepared for very narrow aisle applied in warehouses, which allow MHE to move up and down the floor in precisely the same wheel level position every time. We follow various strict standards including TR34, ASTM, DIN… that have been recognized and applied in most modern factories.

    THE CONSTRUCTION PROCESS INCLUDES:

1. Install construction joints, rail supporting system.

2. Cast concrete by truss screed, laser screed.

3. Bull floating the surface by bump cutter, check rod tools.

4. Pour the hardener powder, if any.

5. Power Float and power trowel by ride on machine.

6. Cure by PVC sheet and water.

7. Inspection and handover for next construction stage.